Secom undertook the Principal Designer role on cable routes for the Thameslink project in the London Bridge area. The installation included a 1.9km cable route. Duties included: safe by design, planning, managing, monitoring and coordinating health and safety in the pre-construction phase.

PROJECT DETAIL
PROJECT DETAILS
| Categories: |
CONTACT
+44(0) 20 7870 7887
info@secomconsulting.co.uk
Mon - Fri: 9:00 - 17:00